Showerthought: figured out I was ferruling every zone at the panel and fighting the can the whole time
Spent 3 hours on a 12 zone job in Mesa last Thursday chasing a ground fault that kept popping back on me. Turns out I was stripping about an inch of jacket, stuffing the bare drain wire into the same lug as the zone commons, and the whole panel was a mess of crossed grounds. An old installer I sub for popped the can and pointed at one wire and said "that's your whole afternoon right there." Now I land every drain on its own bar and question my whole method. Anyone got a rule for keeping the ground bar clean on bigger cans?