I finally saw what a good tube sheet weld does for a whole job
I did a small boiler retube at a shop in Dayton last month and the foreman made me walk the tube sheet before and after reaming the holes. Before, half the tubes had gaps you could feel with a fingernail, and after, all 214 seats pulled up tight with no rework. Turns out the shop had been skipping the reamer for two jobs to save time, and the leak returns were costing way more than the tool ever did. Anyone else deal with a shop that treats reaming like a step they can skip?