Left a pour on the riverbank in Baton Rouge to set too long and had to fight it the whole way
Two sides to this one: pull the forms early and risk a blown edge, or leave them on and deal with a slab that's already setting up on you. Back in March we were pouring a 12x20 pad for a boat ramp dock outside Baton Rouge, and the sun was brutal, around 95 by noon. I gave the crew the go-ahead to leave the forms on an extra 40 minutes while we finished a cold joint on the other side, and by the time I got back the edges were stiff enough that a hand float was sliding instead of biting. We ended up working the perimeter with mag floats and a lot of elbow grease, and I lost maybe half an hour of finish window I couldn't get back. My lead guy swears leaving forms on that long is always a mistake, but another finisher I know says pulling too early on a hot day is worse and you end up with a step edge. I'm honestly not sure which way I lean now. What's your rule for form stripping time when the temp is pushing 95?