My edger bogged down right in the middle of a 24x30 driveway in Bakersfield
Pour went fine until I got to the outside edge last Tuesday and the edger just quit on me halfway around the form. The blade was barely cutting and the mud was already going off, so I ended up hand-edging about 15 feet with a trowel while my buddy tried to keep the rest from setting up. I got it to look decent but the edge line is wavy in one spot and the homeowner already pointed it out. I checked the guard and it was packed solid with old mud so maybe that was the whole problem. Anybody got a trick to keep the guard from gumming up on hot days or should I just swap to a different edger?