Showerthought: nobody pulls the permit before the deck footings go in
I've walked 14 decks in the last two months around Spokane and 9 of them had footings poured before anyone pulled a permit, which means the inspector never sees the hole depth. That one step is where your frost heave problems come from three winters later. Anyone here actually get a homeowner to wait on the dig, or do you just build the paper trail after?