Builder quoted me $12k for site prep, then a guy in Waco did it for $6,400 using a different soil test
Got two bids on site prep for our lot outside Waco and the first builder just assumed we needed a full pier system without anyone walking the dirt, while the second guy dug three test holes and found solid clay at 4 feet. He saved us $5,600 because he actually checked the ground before pricing the foundation. Did anyone else get burned by a builder who skipped the soil test and quoted off a map?