Picked a 4 inch lap over a 2 inch on a mud drum job in Gary, and I want a second opinion
Spent last Thursday on a small package unit down in Gary and the lead gave me the call on the lap for the mud drum nozzle. Went 4 inch because the shell was a little thin and I figured spreading the heat would help. Two passes in and I'm chasing distortion. The 2 inch guy on the other side of the unit had zero trouble. Now I'm wondering if I overthought it. What lap do you run on thin shell nozzles, and does it change if the drum's already been in service a while?