12
Pro tip: After a wall collapse on a site in Spokane, I never skip checking the footing depth with a tape measure before I lay a single brick.
The foreman had eyeballed the trench and said it was fine, but after three courses the whole thing shifted because it was only 8 inches deep in frozen ground, so now I always verify it myself, even if it slows me down for ten minutes.
3 comments