A foreman at a job site in Fort Worth flipped my whole order of operations after one walk-through
Was running a small remodel out in Fort Worth last Tuesday and the GC's foreman walked in, pointed at my framing stack, and asked why I was cutting all lumber first before checking the door rough openings. Turns out two of my openings were off by 3/8 inch because I measured off the subfloor instead of the top plate. Now I lay out every opening before I make a single cut, and I've knocked about 4 hours off my framing days. Anyone else here get humbled by a walk-through like that, or is it just me?