Appreciation post: a site super in Fresno told me to stop bidding jobs off voicemails
I was at a pre-bid walk in Fresno two weeks ago and the super pulled me aside after hearing me talk about a job I priced off a 40 second voicemail. He told me flat out that half his schedule slips come from subs who never walked the site before signing. That hit me because I've done it, and I've eaten the cost on change orders that were nobody's fault but mine. So how many of you actually refuse to bid without a walkthrough, or is that just wishful thinking in this market?