14
Rigging math got me on a 600-ton job in Corpus Christi
Last month we had a 600-ton crawler setting modules at a refinery in Corpus Christi. My foreman handed me the rigging plan and said check the sling angles before we hook up. I did the math quick like I always do, but I missed the load sharing factor on a 4-leg bridle. One leg had way more tension than I figured. The crane operator caught it during his pre-lift review and stopped everything. He showed me on his load chart how I was over by nearly 15,000 pounds on that one leg. Ever since then I double every bridle with a load cell on at least one leg, even on smaller jobs. Does anyone else use load cells regularly, or is that just overkill for most of you?
2 comments
Log in to join the discussion
Log In2 Comments
barbarab5625d ago
Did that load cell cost more than the panic attack you must have had when the operator stopped everything? lol
2
the_joel25d ago
Load cells used to feel like overkill to me too, back when I was running smaller lifts. Figured a good tape measure and some trig was enough. Then I watched a guy on a 3-leg bridle get one leg completely slack while the other two carried damn near everything. Nobody caught it until the load started tilting. Now I rig a cell on at least one leg for anything over 10 tons. That 15,000 pound miss you had, that's a big deal, and the crane op saving you is a good reminder that the math only gets you so far when the ground shifts or the load settles. Cheap insurance compared to a dropped module or a bent boom.
1