Builder in Boise talked me out of a mudroom bump-out by walking the lot with me at 7am
Last month I was dead set on adding a 6 foot bump-out for a mudroom on a custom build outside Boise. The builder met me at the site at 7am before the crew showed and just walked the lot pointing at the grade, and that side drains right into the low corner every spring. He said a 6 foot push there would put the foundation in the wet spot and cost me about $9k extra in drainage I hadn't budgeted. We ended up flipping the mudroom to the north wall instead and saved the whole mess, so now I walk any lot with the builder before I sign a plan. Has anyone else had a builder catch something on site that never showed up on paper?