Watched an old framer in Tulsa cut rafters with a chalk line and a handsaw, and it changed how I price my jobs
Back in 2009 I was a helper on a custom build outside Tulsa and the lead framer, Ray, wouldn't let a single guy touch a skilsaw on the rafters. He'd snap a chalk line, cut every one by hand, and told me a roof that gets cut one rafter at a time fits tighter than one banged out in a stack. I started pricing in that extra time after we walked a house in Broken Arrow and the inspector passed the framing on the first look, no callbacks. Now I build 2 extra days into every roof bid and clients still ask why I'm not the cheapest number. Any other builders out there eating a little labor cost because the fast way kept biting you later?