6
I stopped following the manual for panel grounding after a lightning strike near Cincinnati left everything fried anyway
Every installer I know swears by the factory grounding specs, but after that close hit last August I started running an extra 6-gauge copper to a separate rod and now my false alarm callbacks are basically zero, so has anyone else tested a second ground path against the official guidelines?
2 comments
Log in to join the discussion
Log In2 Comments
the_jason22d ago
Have you noticed a drop in unexplained issues after adding a second ground rod too?
1
hannaho5222d ago
Doubt it was that dramatic of a change honestly.
1