Shoutout to the old lead who told me my wire routing looked like spaghetti, he was right
Two years back I was rewiring a panel on a King Air 200 out at a hangar in Wichita and I thought my harness work was fine. The lead walked over, looked at it for maybe five seconds, and said "that looks like spaghetti, redo it." I was pretty hot about it at the time, but he sat down and showed me how to lace and tie everything so you could actually trace a wire by eye. Now I use wax lacing cord and run every bundle with consistent spacing, and my last three sign-offs came back with zero squawks from QA. It adds maybe 20 minutes to a job, but troubleshooting later takes half the time. So yeah, I owe that guy one. Anybody got a favorite trick for keeping runs tidy in tight spots behind the rack?
Tight spots behind the rack are where lacing really pays off because you can pull each tie snug one at a time instead of fighting a zip tie gun in a four inch gap. Running your bundles along a backer strip or a piece of channel first gives you something solid to tie to, so the wires stay put and you aren't guessing at spacing by feel. Another one that saved me was bundling the slack into a service loop at the bottom instead of leaving extra length scattered through the run. That way the tight section stays clean and you have wire to work with if you ever need to pull a connector out. Takes a little planning before you start, but it beats tearing it all apart later. Curious if the lacing cord holds up for you in high vibration spots or if you switch to something else there.