Can we talk about guys pulling forms too early in this heat?
I poured a 12x20 slab out in Fresno back in July and watched the crew next door strip their forms maybe 5 hours after the last pass. By the next morning the edges were chipped and crumbly and they were mixing patch to hide it. Here is the thing nobody seems to get: when it is 100 degrees out, the concrete sets fast on the surface but the middle is still green, and those edges are the thinnest part. I keep my forms on overnight at minimum in that kind of weather and just float the edges real nice before I leave. I've been finishing for 11 years and I've never had a spalled edge on a job where I gave it the extra time. You would not believe how many callbacks I get asked to clean up come from this one mistake. What are you all doing for cure times when the temp is pushing triple digits out there?
Man, I feel for those guys having to mix patch the next morning, that is a rough way to start the day. Keeping forms on overnight in that heat is smart, those edges just can't take it that early.
Used to roll my eyes at guys leaving forms on overnight, figured they were just babying the concrete. Then we did a pour in July where the morning crew pulled them at like 6am and the edges still crumbled when they went to patch. After that I was sold on leaving them be until things cool down. Losing half a day beats redoing corners all morning.