My 8 yard slab in Fort Worth cracked 36 hours after the pour and I think I found the reason
Poured a 1,200 sq ft shop slab out in Fort Worth on a Friday morning and by Sunday night I had a crack running 14 feet right through the middle of it. I was sick about it. Turned out the subgrade guy watered his base that morning and never told me, so we dumped 8 yards on mud. The mix was running 5 inch slump and my finisher kept troweling while the surface kept sweating back up, which should have been my clue. I called the ready mix plant Monday and they pulled the batch tickets, showed 310 lbs of cement and the water was bumped twice at the plant. We ended up routing and filling it with a semi rigid epoxy, but I'm second guessing if I should have torn it out instead since it's a shop floor that'll see forklift traffic. Has anyone had luck with epoxy injection holding up long term on a slab that cracked that early?
Check the forklift axle loads before you decide on tearing it out, because a 14 foot crack through the middle is basically a hinge point and semi rigid epoxy only holds if the slabs stay put. A shop floor taking loaded lifts will work that joint over time, so what I would do is watch it for a few months and see if the crack opens back up, then cut and pin it if it does. Pulling 8 yards off mud is the real killer here, that water bump at the plant just made a bad pour worse.