15
Vent: Had to choose between a quick lift and a full rig move on a tight site in Spokane
Went with the move to get proper clearance, which added 2 hours but kept the crew safe. Anyone ever faced a similar call where the 'right' way was the slow way?
2 comments
Log in to join the discussion
Log In2 Comments
sarahh482d ago
Man, that extra time always beats a close call any day.
8
leo_kelly1d ago
Two hours is nothing. I saw a guy try to rush a forklift unload in a tight yard, clipped a power line conduit. Shut the whole block down for six hours. @sarahh48 is right, the extra time is just part of the job. You made the call that keeps people from getting hurt and stops a bigger mess later. That's the whole point of being the one in charge.
6